Cozy MKIV Builder's Log Book - June 1998
|
| DATE |
DESCRIPTION |
TIME |
|
| 6/2/98 |
- Make last 3 LWA9 bushings
|
1 hrs |
| 6/3/98 |
- Flox lower right strake to fuselage/spar
|
1 hrs |
| 6/8/98 |
- Glass 2 BID strake/spar inside
- Glass 2 BID strake/fuselage outside
- Flox 3 ribs (R57, R33, TTE) in place and glass 1 BID
|
5 hrs |
| 6/9/98 |
- Trim and sand previous layups
- Cut hole in strake top for fuel filler cap
|
1 hrs |
| 6/13/98 |
- Mark and cut hole for right tank fuel gauge sender
- Mark and cut 1-1/4" hole for fuel sump
- Make sump mold - cover with box tape and attach to fuselage
- Mark and cut small baffle for fuel drain corner - front of tank
- Cut out area for fuel drain aluminum plate
- Flox gas cap base, fuel gauge base, drain plate in place - add 1 BID
- Glass 1 BID tape strake bulkhead - flox last bulkhead in place
- Glass 1 BID 1-1/4" sump hole area
|
6 hrs |
| 6/14/98 |
- Glass bottom of fuel sensor - foam and 1 BID
- Glass bottom of fuel cap - 1 BID
- Glass 1 BID - rest of bulkheads
- Glass fuel sump - 4 BID over box tape
|
4 hrs |
| 6/20/98 |
- Run wingtip wires - right wing
- Trim and sand all previous layups
- Make 1-1/4" hole screen cover
- Fit right and left fuel lines - tank to rear spar area
- Drill and tap fuel drain pad - front corner of tank
|
6 hrs |
|
|
|