Cozy MKIV Builder's Log Book - June 1998

DATE DESCRIPTION TIME

6/2/98
  1. Make last 3 LWA9 bushings
1 hrs
6/3/98
  1. Flox lower right strake to fuselage/spar
1 hrs
6/8/98
  1. Glass 2 BID strake/spar inside
  2. Glass 2 BID strake/fuselage outside
  3. Flox 3 ribs (R57, R33, TTE) in place and glass 1 BID
5 hrs
6/9/98
  1. Trim and sand previous layups
  2. Cut hole in strake top for fuel filler cap
1 hrs
6/13/98
  1. Mark and cut hole for right tank fuel gauge sender
  2. Mark and cut 1-1/4" hole for fuel sump
  3. Make sump mold - cover with box tape and attach to fuselage
  4. Mark and cut small baffle for fuel drain corner - front of tank
  5. Cut out area for fuel drain aluminum plate
  6. Flox gas cap base, fuel gauge base, drain plate in place - add 1 BID
  7. Glass 1 BID tape strake bulkhead - flox last bulkhead in place
  8. Glass 1 BID 1-1/4" sump hole area
6 hrs
6/14/98
  1. Glass bottom of fuel sensor - foam and 1 BID
  2. Glass bottom of fuel cap - 1 BID
  3. Glass 1 BID - rest of bulkheads
  4. Glass fuel sump - 4 BID over box tape
4 hrs
6/20/98
  1. Run wingtip wires - right wing
  2. Trim and sand all previous layups
  3. Make 1-1/4" hole screen cover
  4. Fit right and left fuel lines - tank to rear spar area
  5. Drill and tap fuel drain pad - front corner of tank
6 hrs
------
PREVIOUS TOTAL: 1601 hrs MONTH TOTAL: 24 hrs
CHAPTER 19:

154 hrs

OVERALL TOTAL:

1625 hrs
CHAPTER 21: 41 hrs
CHAPTER 22: 136 hrs