[Prev][Next]

Cozy MKIV Builder's Log Book - May 1998

DATE DESCRIPTION TIME

5/3/98
  1. Level fuselage on sawhorses
1 hrs
5/4/98
  1. Cut I.P. for autopilot switch
    b) Re-attach all wires to switch panel
    c) Wire A.P. (+) and (-) and indicator light
2 hrs
5/10/98
  1. Continue wiring A.P. switch and light
1 hrs
5/11/98
  1. Continue wiring Fuel Pump, Alternate feed, Battery Master
1 hrs
5/12/98
  1. E.A.A. Technical Inspection - Paul Adrien
0 hrs
5/14/98
  1. Attach Nose Gear
1 hrs
5/15/98
  1. Attach main gear and wheels - nose ratchet
  2. Level fuselage for spar attach
  3. Cut wiring holes in main spar bulkheads
  4. Trial fit spar - mark for position and shims - need to level and mount canard
3 hrs
5/22/98
  1. Mount canard
  2. Sand and fit spar and spar cutout
  3. Make 2 EM-2's and fit
  4. Flox and glass EM-2's in place
  5. Flox and 2 BID main spar in place
7 hrs
5/23/98
  1. Cut glass for rest of spar layups
  2. Cut 1/4" plywood for strobe power supply mount
  3. Cut foam for inboard forward spar hole filing
  4. Finish taping main spar to forewall and interior
  5. Glass 3 BID - inboard spar drill holes
  6. Glass plywood and 1 BID mounts for strobe P.S.
  7. Measure for LWA9 bushings - for spar - cut to fit for right side
7 hrs
5/24/98
  1. Re-arrange garage - level fuselage
  2. Fit wing to right side spar
  3. Unpack strakes - watch video of assembly
  4. Fit right bottom strake to fuselage/wing/spar
5 hrs
5/25/98
  1. Cut LWA9 bushings for right wing - line up wing and spar with bolts - clamp in place
  2. Fit lower strake to spar/wing/fuselage
  3. Begin fitting strake bulkheads
  4. Mark fuselage for baggage cutouts - cut out
5 hrs
5/28/98
  1. Make 3 LWA9 bushings
1 hrs
5/30/98
  1. Sand and trim bottom strake and bottom spar
  2. Sand and trim top strake
2 hrs
5/31/98
  1. Sand and trim top strake
  2. Layup 1 BID - joggle in lower strake
  3. Layup thick epoxy layer and peel ply whole strake and front of spar
2 hrs
------
PREVIOUS TOTAL: 1563 hrs MONTH TOTAL: 38 hrs
CHAPTER 14: 103 hrs OVERALL TOTAL: 1601 hrs
CHAPTER 19: 153 hrs
CHAPTER 21: 18 hrs
CHAPTER 22: 135 hrs

[Prev][Next]

[Zeitlin's Cozy MKIV Information] [Zeitlin's Cozy MKIV Logbook]
[Cozy MKIV Information]

Copyright © 1998, 2000 All Rights Reserved, Marc J. Zeitlin
e-mail: marc_zeitlin@alum.mit.edu