Cozy MKIV Builder's Log Book - July 1998

DATE DESCRIPTION TIME

7/7/98
  1. Cut and fit 2 vent lines (1/4" tube) and one fuel injection return line (3/8" tube) for right side fuel tank
  2. Re-micro edges of R33 hole and fuselage/strake cutouts
  3. Micro tubes in place
  4. Glass 1 BID T.E. top strake - epoxy and peel ply whole strake
  5. Glass 2 BID fuselage strake interior
  6. Flox screen on hole (1 1/4")
5 hrs
7/8/98
  1. Trim and sand previous layups
  2. Remove wing from spar
  3. Cut glass for 2" "T" hats for ribs (and peel ply)
  4. Cut fuel sender to length
  5. Cut and bend fuel tubing in fuselage rear
6 hrs
7/9/98
  1. Glass 2" "T" hats on ribs - micro to height first
  2. Reposition fuselage in garage
4 hrs
7/11/98
  1. Trim and sand previous layups
  2. Decide to redo fuel system - use original parts and layout
1 hrs
7/12/98
  1. Cut glass for 2" "T" hat underside reinforcements
  2. Micro and glass "T" hat underside reinforcements
  3. Build flox wall on fuselage side for strake top
4 hrs
7/19/98
  1. Trim and sand previous layups
  2. Remove tape from top strake
  3. Finish cutting and bending fuel tubing in fuselage
    d) Glass and flox both fuel lines to fuselage and through to exterior
4 hrs
7/29/98
  1. Flox top strake to ribs and spar - weigh down
2 hrs
------
PREVIOUS TOTAL: 1625 hrs MONTH TOTAL: 26 hrs
CHAPTER 21: 67 hrs OVERALL TOTAL: 1651 hrs
CHAPTER 22: 136 hrs