Cozy MKIV Builder's Log Book - April 2001
|
DATE |
DESCRIPTION |
TIME |
|
4/1/01 |
- Mount engine with new mount
- Fix vacuum and primer lines for higher engine
- Trim and fit cowlings and baffles - need to modify air filter housing and fuel line
between pumps
|
5 hrs |
4/7/01 |
- Continue air filter housing modifications
- Prepare under pilot seat for ELT installation - I.P. for remote indicator
- Prepare lower cowling for rear baffle installation
|
5 hrs |
4/8/01 |
- Continue above
- Layup 3 BID ELT depression
- Layup 2 BID inside air filter box
- Layup 2 BID lower rear cowling baffle - micro all baffle edges in lower cowling
|
6 hrs |
4/20/01 |
- Sand and trim airbox for exterior 2 BID layup
- Sand and trim ELT mount
- Make aluminum plate for ELT remote I.P. mount - mount in panel
- Mount ELT antennae on pilot seat back - run coax cable
- Begin oil cooler mounting - cut hole in lower cowling, right side
|
4 hrs |
4/28/01 |
- Layup 2 BID airbox exterior
- Layup 4 BID oil cooler mount
- Fabricate 1/8" aluminum retractable wing tie downs per Robin DuBois' plans on web
- Clean up
|
4 hrs |
4/29/01 |
- Trim and sand previous layups
- Flox and 1 BID oil cooler mount into lower cowling - right side
- Flox front rim of top cowling to match fuselage - will need micro
- Trim 1" off cowling rear
- Trim 4" off exhaust pipes
|
5 hrs |
|
|
|