Cozy MKIV Builder's Log Book - April 2001

DATE DESCRIPTION TIME

4/1/01
  1. Mount engine with new mount
  2. Fix vacuum and primer lines for higher engine
  3. Trim and fit cowlings and baffles - need to modify air filter housing and fuel line between pumps
5 hrs
4/7/01
  1. Continue air filter housing modifications
  2. Prepare under pilot seat for ELT installation - I.P. for remote indicator
  3. Prepare lower cowling for rear baffle installation
5 hrs
4/8/01
  1. Continue above
  2. Layup 3 BID ELT depression
  3. Layup 2 BID inside air filter box
  4. Layup 2 BID lower rear cowling baffle - micro all baffle edges in lower cowling
6 hrs
4/20/01
  1. Sand and trim airbox for exterior 2 BID layup
  2. Sand and trim ELT mount
  3. Make aluminum plate for ELT remote I.P. mount - mount in panel
  4. Mount ELT antennae on pilot seat back - run coax cable
  5. Begin oil cooler mounting - cut hole in lower cowling, right side
4 hrs
4/28/01
  1. Layup 2 BID airbox exterior
  2. Layup 4 BID oil cooler mount
  3. Fabricate 1/8" aluminum retractable wing tie downs per Robin DuBois' plans on web
  4. Clean up
4 hrs
4/29/01
  1. Trim and sand previous layups
  2. Flox and 1 BID oil cooler mount into lower cowling - right side
  3. Flox front rim of top cowling to match fuselage - will need micro
  4. Trim 1" off cowling rear
  5. Trim 4" off exhaust pipes
5 hrs
  ------
PREVIOUS TOTAL: 2432 hrs MONTH TOTAL: 29 hrs
CHAPTER 22: 216 hrs OVERALL TOTAL: 2461 hrs
CHAPTER 23: 268 hrs
CHAPTER 24: 113 hrs
CHAPTER 25: 244 hrs