Cozy MKIV Builder's Log Book - June 2000

DATE DESCRIPTION TIME

6/17/00
  1. Finish fitting airbox flaps, etc.
  2. Glass and flox pads for airbox shaft bushings
  3. Continue fitting heat ducts
  4. Glass cabin heat duct tubes smaller to fit SCAT tubing
  5. Glass 2 BID headrest in place
  6. Attach oil filler door - rivets and camloc
7 hrs
618/00
  1. Prepare airbox for bushing floxing
  2. Start oil cooler mount fabrication
5 hrs
6/21/00
  1. Continue mounting oil cooler mount to firewall
  2. Measure for oil lines
  3. Trim and sand headrest layup
2 hrs
------
PREVIOUS TOTAL: 2086 hrs MONTH TOTAL: 14 hrs
CHAPTER 21: 186 hrs OVERALL TOTAL: 2100 hrs
CHAPTER 22: 193 hrs
CHAPTER 23: 208 hrs
CHAPTER 25: 3 hrs