Cozy MKIV Builder's Log Book - November 1998
|
DATE |
DESCRIPTION |
TIME |
|
11/1/98 |
- Trim previous layup - sand foam flush
- Pressure test tank with full water - looks OK
|
1 hrs |
11/2/98 |
- Pressure test tank - air only - looks OK - loses 1/2" water pressure in 24 hrs.
|
1 hrs |
11/6/98 |
- Prepare all surfaces for repair layups - strake top
- Test kerosene heater for garage - works fine after 14 year layoff
|
1 hrs |
11/7/98 |
- Micro and glass top of strake
- Level, fit and bolt left wing to spar
- Fit plywood rib for wing location reference - remove wing
|
5 hrs |
11/8/98 |
- Begin fitting and trimming strake bottom - left
|
4 hrs |
11/9/98 |
- Continue fitting and trimming strake bottom - left
|
1 hrs |
11/14/98 |
- Continue fitting and trimming strake bottom - left and ribs
- Cut holes in fuselage side
|
1 hrs |
11/15/98 |
- Continue fitting and trimming strake bottom - left
|
2 hrs |
11/21/98 |
- Continue fitting and trimming strake bottom - left
- Cut glass for all strake bottom attach layups
- Glass 1 BID strake tail inner surface and outboard edge
- Glass 2 BID around 1 1/4" fule hole
- Micro all baffle holes and notch edges
|
2 hrs |
11/22/98 |
- Trim previous layup
- Flox lower strake to fuselage/spar
- Glass 2 BID strake/spar joint and peel ply
- Glass 2 BID strake/fuselage joint and peel ply
- Glass 1 BID rear strake tail/spar bottom and peel ply
|
4 hrs |
11/26/98 |
- Fit all ribs to bottom strake
- Sand and trim previous layups - sand for strake/fuselage inside layups
- Begin fitting top strake
|
4 hrs |
11/29/98 |
- Prepare all strake bottom and ribs for epoxy layer
- Prepare strake/fuselage inside layups
- Epoxy and peel ply both (1) and (2)
|
4 hrs |
|
|
|