Cozy MKIV Builder's Log Book - September, 2002
|
DATE |
DESCRIPTION |
TIME |
|
9/1/02 |
- Finish GPS Coupler wire installation
- Put air in tires
|
1 hrs |
9/7/02 |
- Tighten Navaid pushrod nut
- Fix leaking gascolator
- Measure for oil cooler scoop and hose - need 1" x 4" to 1.5" diameter
intake
|
2 hrs |
9/9/02 |
- Layup oil cooler air scoop and plenum parts - also turbulators
|
2 hrs |
9/12/02 |
- Check fit of oil cooler air scoop and plenum parts
|
1 hrs |
9/14/02 |
- Finish oil cooler air scoop and plenum layups
- Clean PVA off wheel pants
|
2 hrs |
9/15/02 |
- Trim and sand previous layups
- Begin wheel pants layups
|
3 hrs |
9/20/02 |
- Install oil cooler plenum and scoop
|
3 hrs |
9/21/02 |
- Re-install original pitch trim springs to assist at forward C.G.
- Install turbulators behind L.B. - test for oil temperature air flow
- Cut open fule tank sensor covers - adjust "full" levels
- Measure canard incidence angle - SEEMS to be 0.6 deg. to 1.1 deg. low
|
4 hrs |
9/25/02 |
- Remove oil cooler plenum and scoop - didn't help temperatures
- Perform 1/2 oil change - finish in morning
|
2 hrs |
9/26/02 |
- Finish oil change - oil temps GOOD per flight test
|
1 hrs |
9/28/02 |
- Begin fitting left wheel pants to gear leg and wheel
|
2 hrs |
9/29/02 |
- Nose gear mechanism very tight - remove and lube worm gear bushings
- Fix loose casting/clamp at base of nose gear - had loosened from hard landings
|
3 hrs |
|
|
|