[Prev][Next]

Cozy MKIV Builder's Log Book - January 1998

DATE DESCRIPTION TIME

1/1/98 a) Continue fitting vacuum system - install bracket for regulator
2 hrs
1/2/98 a) Glass nutplates for regulator and filter to front of F-28
b) Glass 3 BID pad for screw clamp for brake lines to fuse. sides
c) Micro top of canopy
d) Drill seven 2-1/4" holes and screw holes for instruments in I.P.
e) Test output of EXCEL spreadsheet for panel overlays
5 hrs
1/3/98 a) Wire layout and cut for alarm system, T&B, VM, Compass
4 hrs
1/17/98 a) Continue installing cable, hose, wire clamps, vac. line
5 hrs
1/18/98 a) Continue installing cable, hose, wire clamps, vac. line
b) Start re-wiring intercom with shielded cable
3 hrs
1/24/98 a) Rewire intercom with shielded cable
b) Wire dimmer pot and connector
c) Cut glass for 3 clamp pads for 5/8" vac. line tubing
5 hrs
1/25/98 a) Continue wiring harness layout
4 hrs
   ------
PREVIOUS TOTAL: 1505 hrs MONTH TOTAL: 28 hrs
CHAPTER 18: 202 hrs OVERALL TOTAL: 1533 hrs
CHAPTER 22: 100 hrs


[Prev][Next]

[Zeitlin's Cozy MKIV Information] [Zeitlin's Cozy MKIV Logbook]
[Cozy MKIV Information]

Copyright © 1998, All Rights Reserved, Marc J. Zeitlin